From £6,500 complete

Bathroom installation, from first sketch to final grout.

One team handles your whole bathroom: design, strip-out, plumbing, electrics, tiling and finishing. You get one fixed price, one point of contact and a bathroom you will love using.

Modern bathroom with walk-in shower and wooden vanity
What is included

Bathroom installation, done properly.

Free design visit

We measure up, talk through layouts and send a 3D-style plan with your quote.

Strip-out and disposal

We remove the old suite and tiles and take all the waste away.

Plumbing and electrics

New pipework, waste, extractor fan and lighting, all certified.

Tiling and flooring

Wall and floor tiles, wet-room floors and waterproof panels.

Walk-in showers

Low-level trays and glass screens, including accessible designs.

Finishing touches

Towel radiators, mirrors, storage and silicone done neatly.

Bathroom with glass shower enclosure and towel radiator
Good to know

One team means no gaps between trades.

With separate plumbers, tilers and electricians, jobs stall while you wait for the next trade. Our team plans the whole job, so a typical bathroom is finished in 7 to 10 working days.

  • Typical bathroom: 7 to 10 working days
  • Toilet kept working overnight where possible
  • Shower and wet-room waterproofing guaranteed
  • Suites supplied by us or by you

Bathroom installation in Stirling and Dunblane

A new bathroom is one of the best upgrades for a home, but it is also the room where small mistakes cause the biggest problems. Hidden leaks, poor waterproofing and badly fitted extractor fans lead to damp and mould. Our bathroom installation process puts the plumbing and waterproofing first and the finish second.

Prices start at £6,500 for a standard bathroom with a new suite, shower over the bath, tiling and a towel radiator. Walk-in showers, wet rooms and full-height tiling are priced on survey. See the full list on our prices page.

Planning your new bathroom

Start with how you use the room: a family bath, a quick morning shower or an accessible space for later life. We will suggest layouts that work with your existing pipes where possible, which keeps the cost down.

Questions

Bathroom installation questions.

How long does a bathroom installation take?

Most bathrooms take 7 to 10 working days from strip-out to final clean. Wet rooms can take a little longer.

Can I supply my own bathroom suite?

Yes. We are happy to fit a suite you have bought, and we will check it before work starts.

Will I be without a toilet?

Only briefly. Where possible we reconnect the toilet at the end of each day.

Do you do wet rooms and accessible bathrooms?

Yes, including level-access showers, grab rails and comfort-height toilets.

Need a plumber or heating engineer?

Tell us what is wrong or what you are planning. We reply the same working day with a time slot or a fixed price.